Posts: 1,268
Threads: 68
Joined: Sep 2022
Thank you Richard! I'll try and be careful.
1999 45' #504 "Magnolia"
Gravette, Arkansas
1996 40 XL Prevost Marathon
Posts: 5,412
Threads: 255
Joined: Jul 2012
And two wet saws………..
If your coach is like mine, Newell put down a layer of thinset, then a layer of fiberglass mesh, then another layer of thinset, then the tile. There is a reason it held up so well over the years.
Richard and Rhonda Entrekin
99 Newell, 512
Maverick Hybrid Toad
Inverness, FL (when we're home
)
Posts: 1,268
Threads: 68
Joined: Sep 2022
Yes it seems to be just like that so the heated mat is between the second layer of thinset and the tile? I'm using an 1/8 in diamond Burr on a high speed rotatory to take the grout out to the thickness of the tile which is 3/8". Trying not to get into the heating blanket.
1999 45' #504 "Magnolia"
Gravette, Arkansas
1996 40 XL Prevost Marathon
Posts: 5,412
Threads: 255
Joined: Jul 2012
I didn’t get into the heating blanket. Both of mine have failed, and I have disabled the circuits.
Richard and Rhonda Entrekin
99 Newell, 512
Maverick Hybrid Toad
Inverness, FL (when we're home
)
Posts: 1,268
Threads: 68
Joined: Sep 2022
Do you have concerns I should know about?
1999 45' #504 "Magnolia"
Gravette, Arkansas
1996 40 XL Prevost Marathon
Posts: 5,412
Threads: 255
Joined: Jul 2012
One of them developed a hot spot that would burn you if you stepped on it. In an abundance of caution with regard to short circuits I turned off the breakers to prevent inadvertent activation
Richard and Rhonda Entrekin
99 Newell, 512
Maverick Hybrid Toad
Inverness, FL (when we're home
)
Posts: 1,268
Threads: 68
Joined: Sep 2022
Good enough for me, I will stop this project. Thanks
1999 45' #504 "Magnolia"
Gravette, Arkansas
1996 40 XL Prevost Marathon