05-27-2023, 04:49 AM
After sealing all the rivets and seams with flex seal we snapped a line with line chalk and put the disks on the coach then finished it by installing the trim pieces. I still have 25 rivets to replace around the opening for the slide and repaint the rivet heads but its done for the most part. I had to jack the coach in a couple places to get the panels aligned.
1999 45' #504 "Magnolia"
Gravette, Arkansas
1996 40 XL Prevost Marathon