10-10-2023, 10:11 AM
I can see the wheels turning……..
Replace the gen with LiPo, should be able to get at least 5000 amp hr in there.
Then add aux generator to coach engine to top off lithium if needed.
Next step add electric drive motors to tags with regen braking.
Replace the gen with LiPo, should be able to get at least 5000 amp hr in there.
Then add aux generator to coach engine to top off lithium if needed.
Next step add electric drive motors to tags with regen braking.
Richard and Rhonda Entrekin
95 Newell, 390 Ex caretaker
99 Newell, 512 Ex caretaker
07 Prevost Marathon, 1025
Maverick Hybrid Toad
Inverness, FL (when we're home
